Fake Isolation - bad illusion from the US

 

 

Fake Isolation by a US company that calls themself Deep Isolation !!! 

 

unsafe US DBD does NOT work with too narrow rotary drilling diameters

 

 

 

 

 

 

 

 

 

Revealing the bad and unserious lies from Elizabeth Muller and her father Richard Muller

 

 

 

 

Die US amerikanische Marketing Firma "Deep Isolation" versuchte uns mit einem Bohrloch-Test zu blenden.

 

Der tief in das Rotary Bohrloch verbrachte "Beweis-Dummy" war aber nur 1,2 m. anstatt 6,6 Meter lang !

 

Der  "Beweis-Dummy" hatte einen Durchmesser von nur ca. 12 cm wo ca. 100 - 140 cm notwendig sind !

 

Ein Unternehmen das so argumentiert ist UN-SERIÖS und fügt der Endlager-Branche schweren Schaden zu.

 

 

 

 

 

 

 

Voice-Over Stream only by Ing. Goebel - some critical words on the Marketing Film from that idiot company
Fake Isolation.mp4
MP3-Audiodatei [4.0 MB]

 

 

 

 

- es gibt keine "stehenden Bohrlöcher" aus dem Rotary Bohr-Verfahren

  Wenn da kein Öl oder Erdgas durchströmt, fallen die von selbst wieder

  zusammen - und dann kann man darin auch gar keine kleinen Endlager-

  Behälter transportieren !!! die ersten 3 gehen durch - dann ist Schluss !

 

- die möglichen Bohr-Durchmesser des Rotary Bohrens weisen in für die

   Endlagerung relevanten Bohrtiefen den Durchmesser von max. 20 cm

   auf - das ist viel zu klein für jede Art von Endlager-Behälter - sei der

   ausreichend abgeschirmt (Menschen am Bohr-Rig) oder auch nicht ...

   Die Durchmesser der Rotary Richt-Bohr-Technik reichen NICHT aus

 

- Elizbeth Muller von der Firma Fake Isolation aber nicht Deep Isolation

  bedient sich eines unseriösen, unwissenschaftlichen Marketings das

  auf Emotionen aber nicht auf Fakten setzt. Übele Hausfrauen-Didaktik

 

- Die Leute von Fake Isolation / Deep Isolation scheinen überhaupt keine

  Vorstellung von einer "endlagerfähigen Geologie" zu haben. - Keinerlei

  Hinweise auf die Geologie in den schamlosen, unwissenschaftlichen und

  undurchführbaren Publikationen dieser (Marketing) Firma. Das ist ein in

  hohem Masse unverantwortliches Verhalten das nicht zu einer sicheren

  Endlagerung führen kann. (Amerika wird offenbar immer dümmer ...)

 

- Die verstrahlen das Personal auf der Bohr-Plattform um vielleicht doch

  noch mit kleinsten unabgeschirmten Behälterchen etwas in die Rotary

  Bohrungen mit viel zu kleinem Durchmesser versenken zu können !

 

- Untiefe Lagerungen haben keinen ausreichenden Bergdruck und sind

  daher nicht verschliessbar. Kein Verschluss = Keine sichere Endlagerung.

 

- Die Methode der Firma "Deep Isolation" aus den USA ist nicht möglich !

 

 

 

 

ein halbwegs ordentliches Gutachten das aber zu tiefe Teufen anstrebte und die SBM nicht berücksichtigt hat - verpasste Chance, weil der K. aus F. wieder mal abgeschrieben hat als er die Aufgabe ...
Gutachten_Tiefe_Bohrloecher_GRS_kmat_52-[...]
PDF-Dokument [12.6 MB]

And this is how Ing. Goebel / Germany understands "Deep Isolation"

(far better then the "Berkley Idea from Elizabeth + Richard Muller)

 

our hostrock geology is a deep rocksalt layer : 1.600 Meters thick with 2.000 Meters Sediment overlay - Location : GLASIN M-V

 

we go in with a Shaft Boring Machine SBM - latest drilling technology from Germany that offers a Mono-Diameter of 12 Meters

 

we store HLW Castor Containers with 10,5 tons net and 120 tons brutto - that is a perfectly shielded casted metal container

 

the rocksalt combined with mountain pressure ensures a perfect closure that even keeps IOD 129 gases in (they travel fast)

 

our approach is safety and not marketing related. Germany is a very densly populated country with 215 people per Square KM

 

the US and the world can learn from DBHD - please look at the plans & tables underneath and visit http://www.dbhd-hlw.de

 

 

 

 

 

deep isolation of nuclear waste with DBHD = Deep Big Hole Disposal Germany - Location Glasin eep isolation of nuclear waste with DBHD = Deep Big Hole Disposal Germany - Location Glasin

 

 

 

The Germans have a technical plan - a building plan - and 13.975 experts

from all over the world have seen this plan and had no complaints at all !

It is a very ambitions plan that requires "flow ice cooling" of a big hole -

but it leads to a super deep and super safe geological repository for HLW.

 

 

 

 

The Germans also have a general nuclear repository plan for all wastes

DBHD for HLW - high level waste - deep rocksalt layer (near Glasin M-V)

ART-TEL for LLW and MLW - a decay tunnel garage (near Karlsburg M-V)

We need both repositories to clean up the surface and enable new NPP.

 

 

The Germans have a calculation for DBHD nuclear repository

in Version 20 - based on offers from industrial companies DE

Capacity 27.500 Mg (tons net) for a price of 6,4 Bio. EUR net

DBHD is by far cheaper then horizonal storage (by 33 to 6,4)

 

 

 

 

The Germans also have a time table to proof, to licence,

to build, to close and to build back DBHD. - The German

nuclear repository has to be approved by parliament ...

The time table gives time for re-checking DBHD in court.

 

 

 

 

as there is many deep rocksalt geologies to be found

all over the world - please take the DBHD plan and

move all HLW to the deep rocksalt geologies to store

them deep and safe for all times - Clean up Biosphere.

 

 

 

 

We do not need unsafe, risky Fake Isolation - what the world needs is safe DBHD storage 