Samara City Road Development >>> Project Plan is existing

 

04. Aug. 2016 - building the plans for Metropol-City-Road to motorway M5

 

Предварительный проект дорог в центре Самары Metropol-the-new-Samara-City-Road-from-centre-to-motorway-Karl-Marx-City_Road-Samara

 

 

We received a plan showing a new road and road extention from

Kirov Avenue to existing motorway ringroad that connects to M 5

The road planning we work on is in the news already : read here

 

 

Work title >>> Karl-Marx-City-Road-to-motorway A5 >>>

 

 

 

 

 

 

We also received text that describes the road building with words :

 

General information is :

the project plan text is about building a new city road from Kirov Avenue to Motorway M5 - Length 19 km - Invest 9.100.000.000 RUB = 130 Mio. EUR

in http://samadm.ru/ City 2018

 

 

Building contractor required :

Russia kicked out all the turkish building companys, now they search new

building contractor, probably russian citys have to build on their own now.

Ing. Goebel Company

 

 

Karl_Marx_City_Road_Samara_Project_Plan_City_Road Предварительный проект дорог в центре Самары State of Development June 2016 - Description will be released in Version 1.1 by December
Предварительный проект дорог в центре Самары putting official road plan into a smaller scale to the crossings to other roads and railway ... поставив официальный план дорожного движения в меньшем масштабе на перекрестках с другими автомобильными дорогами и железнодорожными ... zur Autobahn !!!

 

 

 

 

if it is about 70-90 thousand cars per day it is just 2 lanes - not more ...

 

if you estimate 200 tousand vehicles per day you have to build 4 Lanes

 

lets think about the real amount of lanes the Karl-Marx-City-Road need

 

send money now to my swiss bank account, Ing. Goebel in Switzerland

 

Zürcher Kantonalbank / Schweiz / IBAN CH16 0070 0110 0038 06441 5 

 

Ing. Goebel can also work in russia for 3 years - Road Planning Samara

 

 

 

 

Karl_Marx_City_Road_Samara_Project_Plan_City_Road State of Development June 2016 - Description will be released in Version 1.1 by December
Karl_Marx_City_Road_Samara_Project_Plan_City_RoadПредварительный проект дорог в центре Самары Poster Plan of planned city road Samara - from Kirov to Motorway M5 - zoomable data file
zoom-able picture file - you can see the road and the houses ... is road track OK ? Drawing by Ing. Goebel
XL_Poster_Plan_City_Road_Project_Samara.[...]
JPG-Datei [6.1 MB]

 

 

 

 

Can we start road building city road now ?

 

- permit by govenment given YES ? Show it.

- 3 Mio. Rubel per year given YES ? Show it .

- all landrights given already YES ? Show them.

 

if 3 times YES

 

then we can start building "Karl-Marx-City-Road"

 

from : Kirov Avenue >>> motorway junction M 5

 

Person 1 - responsable to spend the guaranteed budget

Person 2 - working technical Supervisor (100 %)

Person 3 - working budget and law Supervisor

Person 4 - Communication Officer to Gov & City

Person 5 - works on Area 1 and 4

Person 6 - works on Area 2 and 3

Person 7 - works on Area 5, 6, 7 and 8

Volker Goebel Nr. 8 - architect and webmaster

Person 9 - a student that helps locally

Person 10 - a student that helps locally

 

This team 10 can be from government companys

with people from private sector and youngsters

make of list of people who are interested or

you might have a list of project staff already

 

 

It is all public - all the time - every Rubel

we ask companys to give "Quotes" (prices)

as turks are out ? and nobody will come 

we do it in russia with russian people

 

 

 

 

 

Start Kirlova - Area 1. - street lengh is 1.735 Meter

 

and there is a road traffic bridge to be build over rail tracks !?

 

Marx_Motorway_City_Road_Samara_Project_Plan_City_RoadKarl Marx City Road Project Samara - from city center to motorway M5 Startpoint Kirova Avenue in Samara - near Kirova Place - is that already the right track ? Y/N ----- Предварительный проект дорог в центре Самары
print-able picture on DIN A4 Format paper pages - for looking, corrections Y/N and the paper documentation
01_Poster_Plan_City_Road_Project_Samara.[...]
JPG-Datei [298.3 KB]
Area 1 in a .pdf version - anybody can print that on A4 or A3 and work with a pen in it - do teh landowner list now
01_Poster_Plan_City_Road_Project_Samara.[...]
PDF-Dokument [1.4 MB]

 

 

 

 

 

 

 

 

 

street lenght Area 2. is 2.470 Meters

 

Karl Marx City Road Project Samara - from city center to motorway M5 Karl Marx City Road Project Samara - from city center to motorway M5 - WE NEED THAT ! ----- Предварительный проект дорог в центре Самары
Area 2 in a .pdf version - anybody can print that on A4 or A3 and work with a pen in it - do teh landowner list now
02_Poster_Plan_City_Road_Project_Samara.[...]
PDF-Dokument [1.3 MB]

 

 

 

 

 

 

 

 

 

 

 

Area 3. - street lenght is 3.770 Meter

 

Karl Marx City Road Project Samara - from city center to motorway M5----- Предварительный проект дорог в центре Самары on ground - or long bridge - or 2,5 km Tunnel - we have to get all 3-4 prices from companys and and calculated cost of land to pay the re-settlements bravely
Area 3 in a .pdf version - anybody can print that on A4 or A3 and work with a pen in it, calculate these 3-4 options
03_Poster_Plan_City_Road_Project_Samara.[...]
PDF-Dokument [1.3 MB]

 

 

 

 

 

Archi is Architect, he is also studied Dipl.-Ing., he is also studied Artist, he

is master of industry and he is master in building related web-work doing.

 

He wants to be a good head of city building, he is acting as architect with

a big heart for the commercial and industry companys. He works for all ...

 

Archi wants to kiss and hug Putin and all people in russia and elsewhere.

My main work is architect >>> an architect is an architect is an architect 

 

Read it in english - i do not speak a word russian - only " очень хорошо "

In ArchiCAD software i can show all scales. 1:10.000, 1:2.000 and 1:100 

 

 

 

 

 

 

Area 4 - street length is 1.843 Meters 

 

Karl Marx City Road Project Samara - from city center to motorway M5 ------ Предварительный проект дорог в центре Самары Tree - foodpath - lane - lane - bicyclepath / that is 12 Meter wide road + trees on both sides ----- Предварительный проект дорог в центре Самары
Area 4 in a .pdf version - anybody can print that on A4 or A3 and work with a pen in it, measurement of the 2 lanes
04_Poster_Plan_City_Road_Project_Samara.[...]
PDF-Dokument [815.1 KB]

 

 

 

 

 

 

 

 

 

Area 5. - street length is 3.248 Meters

 

Karl Marx City Road Samara from Centre to Motorway M5 we should have FUEL & TOILET in this area - find FUEL Company to build that - possible ... ----- Предварительный проект дорог в центре Самары
Area 5 in a .pdf version - anybody can print that on A4 or A3 and work with a pen in it, calculate these 3-4 options there is space for a fuel & toilet station on both sides
05_Poster_Plan_City_Road_Project_Samara.[...]
PDF-Dokument [1.0 MB]

 

 

 

 

 

 

 

 

 

Area 6. - street length is 2.037 Meter

 

Karl_Marx_City_Road_Samara_Project_Plan_City_Road can we do a few aditonal trees on each side in area 6 - lets ask the farmers - IN & OUT road ----- Предварительный проект дорог в центре Самары
Area 6 in a .pdf version - anybody can print that on A4 or A3 and work with a pen in it, - its is all fine here
06_Poster_Plan_City_Road_Project_Samara.[...]
PDF-Dokument [697.7 KB]

 

 

 

 

 

 

 

 

 

 

Area 7. - street lenght is 1.085 Meters

 

foodpath - lane - lane - bicycle path / that is 2 + 5 + 5 + 2 = 12 Meter / in Area 7 / OK ? ----- Предварительный проект дорог в центре Самары
Area 7 in a .pdf version - anybody can print that on A4 or A3 and work with a pen in it, - its is all fine here
07_Poster_Plan_City_Road_Project_Samara.[...]
PDF-Dokument [916.6 KB]

 

 

 

 

 

 

 

 

 

Area 8. - street length is 2.439 Meters

 

Samara motorway in and out - New City Road Karl-Marx Avenue----- Предварительный проект дорог в центре Самары you reached first target - decide for direction north or go on eastwards - bonne route ... Now you got more detailed papers to write with your hand on - do a correction proposal and send good photo to info@ing-goebel.de - building ground good, middle, bad
You reached your Target - You reached your target - But we forgot to give this motorway a number - no number for the motorway yet in all official maps
08_Poster_Plan_City_Road_Project_Samara.[...]
JPG-Datei [206.9 KB]
Area 8 in a .pdf version - anybody can print that on A4 or A3 and work with a pen in it, - its is all fine here
08_Poster_Plan_City_Road_Project_Samara.[...]
PDF-Dokument [2.3 MB]

 

 

 

 

 

 

 

 

 

Total street length is app.  18.643 Meter - in Areas 1. to 8.

 

----- Предварительный проект дорог в центре Самары it just helps thinking - the work is in the .pdf files of area 1 to area 8 - print and go in with a pen - what ground pressure ? is it wet, is it dry ? Measurement of road there? type of road? define all crossings with railway & other streets - shall i ?
all browsers can use this animated.gif - send it to your people, ask if it is OK - lets us hear what they have to say ... Marx-Motorway-City-Road-Samara
Samara_Marx-City_Road_to_Motorway.gif
GIF-Datei [3.7 MB]

 

 

 

 

 

 

 

 

 

Lets THINK about the Measurement of the new city road ...

 

we are planning for 70 - 90.000 vehicles per day - is 2 Lanes for overland

and 4 Lanes within center of town OK ? how far pedestrian ? how far with

the red bicycle track - how thick do you do the layers under road usually ?

 

this looks good - this can be the standard shape of the new city road  ? :

VPK lease send a message with the main corrections and i follow them !

 

----- Предварительный проект дорог в центре Самары KARL-MARX-CITY-ROAD TO MOTORWAY SAMARA IN AND OUT (STANDART SHAPE GOOD ?) KARL-MARX-CITY-ROAD TO MOTORWAY SAMARA IN AND OUT (STANDART SHAPE GOOD ?)
----- Предварительный проект дорог в центре Самары KARL-MARX-CITY-ROAD TO MOTORWAY SAMARA IN AND OUT (STANDART SHAPE GOOD ?)
----- Предварительный проект дорог в центре Самары Standard Layers of City Road Samara (where ground is stabile)
Cut - Detail Layers under Karl-Marx-Street Samara / Russia----- Предварительный проект дорог в центре Самары Special Layers and side walls for weak underground areas to be able to build there
----- Предварительный проект дорог в центре Самары KARL-MARX-CITY-ROAD TO MOTORWAY SAMARA IN AND OUT (STANDART SHAPE ?) KARL-MARX-CITY-ROAD TO MOTORWAY SAMARA IN AND OUT (STANDART SHAPE GOOD ?)

 

 

we started on Page 1 = "hot in place" asphalt repaving

 

you are on Page 2 now = "Samara City Road Development"

 

please send a message with you corrections on the plans ...

 

new asphalt production unit in Samara for Frunse etc. ...

 

 

 

 

 

 

 

 

 

 

What kind of GEO-DATA we have for the Areas 01 to 08 ?

 

do we have official measurement data showing existing structures in

the Area 01 ? Here in Switzerland such data is full public and for free.

 

Ing. Goebel needs .dwg or .dxf Data in scale with existing streets in

to plan new Karl-Marx-City-Road to Motorway. - info@ing-goebel.de

 

and introducing circle crossings into russian street building exhibition.

 

here is an example of the very good swiss public geo data system :

 

 

----- Предварительный проект дорог в центре Самары circle crossing without traffic lights - very effective - good example for city roads
----- Предварительный проект дорог в центре Самары that is for one lane in every direction - does 60 to 70.000 cars per day easily ...

 

 

 

 

WE NEED DATA OF THE EXISTING SITUATION to do planning on the old and narrow structures - and to know about the connections to existing 

road structures in the north - the lots of land and what houses touch ...

 

SEND .dxf data - only the areas 1 to 8

- then the real planning CAN START

 

i do it - i am able and willing to do the building plans for the METROPOL

the big in and out street for Samara City - i offer to do the drawings we

need to build - and i stay for 3 years - i work in Russia and in the world

 

 

 

for planning its needs a digital vector file as .dxf or .dwg - the .pdf is just an example how perfect measurement is in Switzerland - please send data or we measure it by GPS newly - no data no plans
Geo_Data_Swiss_Open_Public_System.pdf
PDF-Dokument [699.2 KB]
----- Предварительный проект дорог в центре Самары AwtoWAS / Lada car production Samara Oblast / 7.000 employees / good affordable cars !!!
----- Предварительный проект дорог в центре Самары Karl-Marx-City-Road to Motorway M50 Samara Metropol Magistral Olympia 2018 OK ? - Start setting measurement ? - can be connected to all streets that exist already

 

Sehr geehrter Herr Goebel,

 

das ist schon besser. 

 

Mit freundlichen Grüßen

Univ.-Prof. Dr.-Ing. Dirk Vallée

Lehrstuhl und Institut für Stadtbauwesen und Stadtverkehr

RWTH Aachen University

Mies van der Rohe Straße 1

52074 Aachen

Tel.: ++49 (0) 241 8025200

vallee@isb.rwth-aachen.de     

www.isb.rwth-aachen.de

 

 

 

 

 

 

 

Lets see - how the first Measurement reacts to a crossing ...

 

i am doing just a few tests on the proposed City Road Measuement now : 

 

 

----- Предварительный проект дорог в центре Самары Samara Metropol Road - Karl-Marx-Street Samara - Samara Road Development 2 Streets crossing each other but houses cause us change in axe - like in area 1 Samara - this is the version with 2 lanes to develop the methods of construction - first crossing done

 

 

 

 

 

every person in the world an drive that !

 

- works good without traffic lights 

- without curving around in roundabout

- for cars, lorrys, cyclists, pedestrians

- and with drainage for the waters

- and it looks good because it is good

- keeping it simple - money is money

 

 

 

 

 

----- Предварительный проект дорог в центре Самары Samara Metropol Road - Karl-Marx-Street Samara - Samara Road Development black lanes - white marking - grey pedestian path - red cyclist path - horizontal dominates - half of the Metropol in the northern parts is already existing as 2 lane road - shall we realy go on 4 lanes there in planning ?

 

 

 

 

 

every person in the world an drive that !

 

- works even without traffic lights good

- without curving around in roundabout

- for cars, lorrys, cyclists, pedestrians

- and with drainage for the waters

- and it looks good because it is good

- Metropol - is that big or clever or both ?

 

take 101010 picture and ZOOM IN

 

 

 

 

----- Предварительный проект дорог в центре Самары Samara Metropol Road - Karl-Marx-Street Samara - Samara Road Development looks good in the landscape (the red is darker in build reality) - modern street shape 2016
Samara Metropol Road Development - Karl-Marx-City-Road-to-Motorway ----- Предварительный проект дорог в центре Самары

 

 

 

 

Link to the 63.ru Website - there is links to 3 videos too :

 

>>> http://63.ru/text/newsline/188011988111360.html

 

 

 

 

 

 

 

 

 

 

 

 

 

 

----- Предварительный проект дорог в центре Самары Putin is a success story - and there is many people who like Putin - Putin wants Russia to work hard - doing the things themself - not asking expensive companys - Do it Russia
----- Предварительный проект дорог в центре Самары Metropol road Samara - Karl-Marx Street Samara - from City centre to motorway M5 Several street and bridge building project in the area of Samara / Russia - we are doing the Metropol Road planning from Krirov (Samara City) to the Motorway M5

 

 

I put the money numbers from the newspaper in a table

 

Total invest is 31 Milliard Rubel - the newspaper writes ...

 

Government Ministry for Traffic prepares (Moskau)

There was / is a Commission sitting on it (politics)

Ministry for Traffic Moskau checks the plans (work)

High level talks on Samara street projects : (happend)

Gov. Nikolai Merkushin / Präsident Wladimir W. Putin 

 

It needs contract paper between Moskau and Samara

Total sum - and year budgets have to be written down

 

----- Предварительный проект дорог в центре Самары

 

Project-Name

Gov. Moskau

money / IN

Oblast Samara

gov. money / IN

Private Sector

money / IN

       

Highway Central

Street Samara

City to motorway

Karl-Marx-Street

Total 9 Mrd. rub

70-90.000 cars

capacity / day

 

4,5 Mrd. Total

in 3 years !!!

currency rubel

for 19 km

 

so Oblast have to give also 4,5 Mrd.

 

street building

costs money

who calculated ?

street 

building is

economy

stimulation

       

 

New

Bridge Wolga

near Ekaterinova

for southern

overland road

Samara Circle

16 Mrd. Total

starting 2018

it is to complete

the ring street

around Samara

good project

 

private investor

welcome - he

can take money

for using bridge

street

building

opens the

land for

economy

 

you can invest

and collect

bridge money

       

New

Bridge Wolga

near Frunse

35.000 cars

day capacity

3 Mrd. in 2017

3 Mrd. in 2018

(currency rubel)

 

480 Mio. Rubel are already in 

have not

found location

russian name

is ? Link ?

 
       
       

Total all 3 projects

in July 2016

26,98 Mrd. Rubel Gov.

Invest

4,5 Mrd. Rubel

for Samara City

Street - please

 

 

 

Infrastructure development targets :

 

1. developing Samara IN and OUT traffic with STREET SAMARA

2. doing bridge on right location for southern street (full Circle)

3. reducing the traffic overload on northern M5 - then repaving

 

That is improoving and keeping the infrastructure on good level

 

 

Russia have to build with own companys now, the Turks are out?

and EU sanction and RU sanctions do not allow financial business

 

Ing. Goebel can do the building plans and he can help to buy the

street building machines the programm needs. Work contract ...

 

There is a team building successfully a bridge/street project in

Samara - big team need next contract - keep them im Samara

Seven Areas Metropol can be build by 4 local building companies

 

 

----- Предварительный проект дорог в центре Самары there is a company building in Oblast Samara - they might be very happy to have contract for Karl-Marx-City-Road - their Bridge and Road Building Project finishes on the road in 2018 so we should do planning now for keeping that team in Samara ...
----- Предварительный проект дорог в центре Самары overview picture Samara road projects ! plus repaving overland road Sysran to Toljatti ?
----- Предварительный проект дорог в центре Самары Metropol-the-new-Samara-City-Road-from-centre-to-motorway-Karl-Marx-City_Road-Samara

 

 

----- Предварительный проект дорог в центре Самары http://www.volker-goebel.biz/X_Drivers_View_Metropol_Crossing_Karl_Marx_City_Allee_Samara_Draft_Ing_Goebel_Dr_Vallee.jpg

 

 

 

AW: >>> Planungs-Consulting für "City-Road Samara / RU" 130 Mio. EUR / 9 Mrd. Rubel

 

Dirk Vallée

An  Ing. Goebel  

2 Anlagen

 

 

Sehr geehrter Herr Goebel,

 

vielen Dank für die Anfrage. Ich bin zwar Bauingenieur und Verkehrsplaner, aber kein Experte für Geotechnik (Untergrund) oder Straßenbautechnik. Dazu haben wir in der Fakultät eigene Lehrstühle, die Kollegen Ziegler (Geotechnik) und Oeser (Straßenbau). Auch habe ich keine Zeit (und wenig Lust) öfter nach Samara zu reisen und den Bau zu überwachen.

 

Was Ihnen allerdings mitgeben möchte ich, dass ich den Entwurf des Knotens für ungeeignet und sehr unfallträchtig halte. Ein Fußweg auf einer Seite im Bereich außerorts ist ok, Sie sollten aber auch an Fahrräder oder Mofa etc. denken und dafür eine Verkehrsanlage vorsehen (Radwege etc.). zudem sollten sie an den Knoten Querungsmöglichkeiten für die Fußgänger und Zweiräder vorsehen. Ob das Brücken, Unterführungen oder einfache und markierte Überwege sind kann ich nicht beurteilen – aber so halte ich das für sehr bedenklich und unfallträchtig.

Was mir dann noch an dem Knoten auffällt ist, dass die Nebenstraße ohne weitere Absicherung in eine mehrbahnige und mehrstreifige Hauptstraße einmündet. Auch das halte ich für sehr bedenklich und sehr unfallträchtig, zumal außerorts mit hohen Geschwindigkeiten zu rechnen ist.

 

Insofern MÜSSEN Sie sich hier etwas anderes einfallen lassen. Dazu könnte ich Sie beraten (wenn Sie mögen).

 

Mit freundlichen Grüßen

Univ.-Prof. Dr.-Ing. Dirk Vallée

Lehrstuhl und Institut für Stadtbauwesen und Stadtverkehr

RWTH Aachen University

Mies van der Rohe Straße 1

52074 Aachen

Tel.: ++49 (0) 241 8025200

vallee@isb.rwth-aachen.ed   

www.isb.rwth-aachen.de

 

 

 

 

 

 

 

Sehr geehrter, hoch geschätzter Herr Prof. Vallée,


Ihr klugen Antwort zeigt das Sie ein Mann sind der weiterhilft.

Solche Professoren sind gut für die Studenten. 


Ihre Antwort zeigt auch wie realistisch Sie denken und handeln.

Gern werde ich Sie dem Kunden vorschlagen.


Gern kommen wir zu gegebener Zeit wieder auf Sie zu. 


Mit dankbaren besten Grüssen

Volker Goebel

Architekt / Dipl.-Ing.

 

 

 

 

 

 

Freundliche Post von Dr. Klug TU München / Lehrstuhl Verkehrswegebau

 

Hallo Herr Goebel,

 

ich habe nicht die richtige Kompetenz für dies Aufgabe und schlage vor, dass Sie sich an unseren Lehrstuhl Verkehrswegebau wenden:

http://www.vwb.bgu.tum.de/startseite/

 

Gruss,

Stefan Klug

 

 

 

Hallo Herr Goebel,

ich meinte aber nicht den LS Verkehrstechnik von Prof. Busch, sondern den LS Verkehrswegebau von Prof. Stephan Freudenstein.

 

Gruss,

Stefan Klug

 

 

 

 

 

 

Sehr geehrter Herr Goebel,

 

vielen Dank für die Anfrage.

Aus Kapazitätsgründen kann ich Ihnen leider für die sicherlich interessante Aufgabe nicht zur Verfügung stehen.

 

Mit freundlichen Grüßen

Stephan Freudenstein


Univ.-Prof. Dr.-Ing. Stephan Freudenstein

 

Technische Universität München

Lehrstuhl und Prüfamt für Verkehrswegebau

Baumbachstraße 7

81245 München

 

Tel +49.89.289.27022

Fax +49.89.289.27042

 

E-Mail: stephan.freudenstein@vwb.bv.tum.ed

Internet: www.vwb.bv.tum.de

 

 

 

 

 

Freundliche Post von Frau Dipl.-Ing. Breddemann / Uni Bochum

Lehrstuhl für Verkehrswegebau

 

 

Sehr geehrter Herr Goebel,

 

erst nach einer offiziellen Beauftragung unseres Lehrstuhls Ihrerseits, könnte der Fragestellung nachgegangen werden. Bitte wenden Sie sich für weitere Anfragen an folgende E-Mail-Adresse: verkehrswegebau@ruhr-uni-bochum.ed

 

Mit freundlichen Grüßen,

i.A.

Daniela Breddemann

 

 

 

 

Sehr geehrter Herr Goebel,

vielen Dank für ihre Anfrage, aber wir haben kein Interesse, da das Projekt nicht in unseren Forschungsbereich passt. Mit dem Einsatz von Geogittern und Spundwänden haben wir uns bisher nicht beschäftigt.

 

i.A. Nina Nytus

 

Prof. Dr.-Ing. Martin Radenberg

Lehrstuhl für Verkehrswegebau

Fakultät für Bau- und Umweltingenieurwissenschaften

Gebäude IC 4/127

Universitätsstrasse 150, D - 44801 Bochum

Telefon 0234-3227437

Telefax 0234-3214152

 

 

 

 

 

 

Sehr geehrter Herr Goebel,

 

wir danken für Ihre freundliche Angebotsaufforderung zu o. g. Projekt.

 

Wir bedauern Ihnen mitteilen zu müssen, dass wir hierzu kein wirtschaftliches Angebot abgeben können.

 

Wir hoffen auf Ihr Verständnis und würden uns freuen, bei künftigen Anfragen wieder von Ihnen berücksichtigt zu werden.

 

Mit freundlichen Grüßen

Vanessa Seitz  
Kalkulation Tiefbau
____________________________________________

MAX BÖGL 
Postfach 11 20 
92301 Neumarkt

Tel.: +49 (0) 9181 909 - 13919 
Fax: +49 (0) 89 9454 - 87 13919
E-Mail: vseitz@max-boegl.ed
Internet: www.max-boegl.de 
http://www.max-boegl.de/infoflyer.pdf

 

 

 

 

 

 

wir haben einen Brief aus Moskau erhalten

we have received a letter from Moskau

 

 

 

 

Магистраль Центральная в г.Самаре (Россия)

 

E-Mail von СК ВПК-строй ООО: Магистраль Центральная в г.Самаре (Россия)

 

СК ВПК-строй ООО

An  Ing. Goebel  

 

Добрый день.
Продолжение нашей переписки сообщаю Вам следующее.

В связи с возобновлением финансирования строительства в Самаре Магистрали "Центральная" предлагаем Вам рассмотреть возможность участия Вашей организации в софинансировании и строительстве данного объекта инфраструктуры. 


Для участия в проекте от иностранного партнера потребуется софинансирование (собственными или заемными средствами) в размере около 4,5 млрд.руб. (65 млн. Евро). Возможно получение гарантий от Правительства РФ.


Со своей стороны, обладая определенным административным ресурсом и опытом работы, готовы оказать Вам максимальное содействие в получении контракта на строительство указанной Магистрали, а также в его реализации в Самарской области.

p.s. Есть возможность получить также и контракт на строительство мостового перехода через реку Волга около с. Климовка начальной стоимостью более 16 млрд.руб. 

Конт. лицо по проекту: Борис Юспа, тел. +7 905 890 0105.

-------------------------------- 
С уважением,
Леонид Дорошинский
строительная компания
ООО "ВПК-строй"
Директор
ИНН / КПП 6312133818 / 631201001
ОГРН 1136312010482
Тел./факс: +7 (846) 248-1461
моб. +7 927 208 1971.

 

 

 

 

 

 

 

 

 

Magistral Central in Samara (Russland)

 

E-Mail von SC VPK-Betrieb Unternehmen: Magistral Central in Samara (Russland)

 

SC VPK-Betrieb Ltd.

An: Ing. Goebel

 

Guten Tag Herr Goebel,

 

Fortsetzung unserer Korrespondenz um Sie über Folgendes zu informieren.

 

Im Zusammenhang mit der Wiederaufnahme der Baufinanzierung in Samara Turnpike "Central" vorschlagen, dass Sie die Teilnahme Ihrer Organisation bei der Kofinanzierung und den Bau der Infrastruktureinrichtung in Betracht ziehen.

 

Um in das Projekt von der ausländischen Partner teilnehmen erfordern eine Kofinanzierung (eigene oder Fremdmittel) in Höhe von etwa 4,5 Milliarden Rubel. (65 Millionen. Euro). Mögliche Garantien der russischen Regierung zu erhalten.

 

Für seinen Teil, bestimmte administrative Ressourcen und Erfahrungen mit, sind wir bereit, maximale Unterstützung zu schaffen, in den Vertrag für den Bau dieser Autobahn zu erhalten, sowie bei der Umsetzung in der Region Samara.

 

P. S. Es ist auch möglich, einen Vertrag zu bekommen, eine Brücke über die Wolga etwa mit zu bauen. Klimovka Anfangswert von mehr als 16 Milliarden Rubel.

 

Projekt-Geschäftsführer ist die Person Boris Yuspa, Tel. +7 905 890 0105.

 

 

 

Mit freundlichen Grüßen,

 

Leonid Doroshinsky

Bauunternehmen

LLC "VPK-Betrieb"

Geschäftsführer

 

INN / KPP 6312133818/631201001

BIN 1136312010482

 

Tel. / Fax: +7 (846) 248-1461

mob. +7 927 208 1971.

 

+7 is predail of Moskau ! - are you working for ministry - i am at your service

 

 

 

 

 


Re: Answer to your letter / Магистраль Центральная в г.Самаре (Россия)

 

Ing. Goebel

An  СК ВПК-строй ООО  

4 Anlagen

 

Hello, dear Boris Yuspa (Project Leader ВПК-строй)

Hello, dear Leonid Doroshinsky (CEO ВПК-строй)

 

Thank you for your last letter - Only me is willing to come.

Due to the EU sanctions no financial business is allowed.

But an engineer is free to accept a 3 year contract in RU.

 

I am willing to do the planning work for Magistral Samara.

I am willing to import machines for russian companies by

ship - on my company name - that is close to not legal ...

 

Street planning and street building is a very local work so

in Moskau it is about showing the plans and getting the OK.

Boris, please find a contact to the Samara road authoritys.

 

I have made tables to calculate the Magistral Karl Marx.

It can be one big company or it can be 4 lots to smaller

local companies. - Russia has to build on it own now !!!

 

The turks are out ? the EU will not - STRABAG company

got no base in Russia & HOCHTIEF got no base either.

We have to improve local companies with machinery ...

 

The first part of the drawing work is done - it is all there :

http://www.ing-goebel.de/samara-city-road-development/

Who-ever sends a work contract for 3 years can win me.

 

With best regards

Volker Goebel

Dipl.-Ing. / Architekt

 

 

http://www.volker-goebel.biz/Logo_Ing_Buero_Goebel_Schwerin.jpg

 

 

 

Many names - one project : 19 km long street

 

Karl-Marx-... (on the last official plans)

City-Road (english, to describe the type of street)

Metropol (name in the newspapers)

Magistal (by Bauunternehmen LLC "VPK-Betrieb")

Karl-Marx-Street 101 (the post adress you get)

(i like all of these names - and 5 is enough)

 

Metropol Road Samara :  is 2/8 a new track = new streets

Metropol Road Samara : it is  6/8 overworking existing streets

 

that is not 100 km straigt in Lybia

that is working for thousands of local people

digging, water, wastewater, eletricity, telecom, and road

 

Strabag is the only global player in street building

they have many offices but none in Russia

The turks are going a bit wild these days ?

Putin wants the russian companys on the work

 

big building projects like streets have a year budget

that is guaranteed - and it has to be payed bit by bit

I can help you with the plans - and getting machines

 

i want a 3 year work contract based in Samara City

380.000 rub per month (i have to pay taxes in RU)

 

you can invite me to Moskau - i accept work contract

but i want to be based in Samara because road there

 

 

There is a building company working in Samara that

does Frunsen bridge. They have a 104.000 m3 of

asphalt in the project plans. This Team / Company

needs a new contract for after Frunsen Bridge ...

Keep them in Samara - the have machines and men.

 

 

 

 

 

 

I am architect - doing the plans they want - See Plan Here :

 

----- Предварительный проект дорог в центре Самары Metropol slim - the out of town version - valid Standard Drawing with traffic signs - Ing. VG
----- Предварительный проект дорог в центре Самары Metropol Standard - the inner city version - Standard drawing with traffic sign. - Ing. Goebel
karl marx city road measurement Metorpol----- Предварительный проект дорог в центре Самары General Measurement of Standard Version
without plans nobody can build in a city - that needs plan making for 3 years - sitting and running 28.800 hours - working the informations in - offer good work contract please
Measurement_Metropol_Magistrale_Samara_K[...]
JPG-Datei [127.2 KB]
----- Предварительный проект дорог в центре Самары General Basic Design of the Samara Karl-Magistral City road to motorway - for W.W.Putin
----- Предварительный проект дорог в центре Самары Measurement of a modern city street heading towards the motorway - Samara OUT and IN

 

 

 

 

YOU can calculate it for your company by the Meters 

 

 

Ar

ea

Path Drain Lane1 Lane2 Wall Lane3 Lane4 Drain

Bic

ycle

Gr

een

  4 1,7 5 5 0.3 5 5 1,7 2 7,5
                     
1. 1.735 1.735 1.735 1.735 1.735 1.735 1.735 1.735 1.735 1.735
  area 1 contains a road traffic bridge over 3 railway tracks !!!
                     
2. 2.476 2.476 2.476 2.476 2.476 2.476 2.476 2.476 2.476 2.476
                     
3. 3.770 3.770 3.770 3.770 3.770 3.770 3.770 3.770 3.770 3.770
  app. 15 family houses have to be resetteled in area 3
  and big traffic crossing under difficult angle in area 3
                     
4. 1.843 1.843 1.843 1.843 1.843 1.843 1.843 1.843 1.843 1.843
                     
5. 1.500 3.248 2.800 3.248 3.248 3.248 2.800 3.248 3.248 3.248
                     
6.   2.034   2.034 2.034 2.034   2.034 2.034 2.034
                     
7.   1.095   1.095 1.095 1.095   1.095 1.095 1.095
                     
8.   2.437   2.437 2.437 2.437   2.437 2.437 2.437
                     
T.                    
                     

 

that can be 4 local building companies - or one very big company.

Street building project seeks contractors to build from Area 1 to 8

Putin Gov. wants to better good companies for building in Russia !

 

 

----- Предварительный проект дорог в центре Самары this is the planning task i say YES to - Dipl.-Ing. Volker Goebel / Architect (will 3 years work)
----- Предварительный проект дорог в центре Самары ----- Предварительный проект дорог в центре Самары

 

 

who is Architect Volker Goebel ? Doing drawings, doing planning work !

 

for further information visit website and have a look in the work papers.

 

Sorry most of the papers are in german language but english CV given

 

 

 

 

we started on Page 1 = "hot in place" asphalt repaving

 

you are on Page 2 now = "Samara City Road Development"

 

please send a message with you corrections on the plans ...

 

 

 

----- Предварительный проект дорог в центре Самары it is nearly a motorway level with inner city qualities on the sides - City Road Design Putin
MEASUREMENT_Metropol_City_Road_Samara_Karl_Marx_Magistral.jpg ----- Предварительный проект дорог в центре Самары
LAYERS_Samara_City_Street_Karl_Marx_Magistral.jpg ----- Предварительный проект дорог в центре Самары
Karl-Marx-City-Road-Metropol Samara / Russia----- Предварительный проект дорог в центре Самары for wet ground areas - all the same but with "Spundwand" and deeper drain pipes - Ing. VG
CUT_City_Street_Profile_Samara_Karl_Marx_Magistral.jpg----- Предварительный проект дорог в центре Самары 4 Layers for good, dry, stabile ground - if wet and week it need "Spundwände" on the sides and thicker packing under the street - this is only for good, dry and stabile undergrounds ...
----- Предварительный проект дорог в центре Самары 7 Layers and "Spundwände" for wet, instabile grounds - streets are made for heavy traffics
----- Предварительный проект дорог в центре Самары Samara Metropol Magistrale Karl-Marx-City Street Samara IN an OUT - towards Motorway M5 That is it for now - how do we come together ? - Thank to ministry & to W.W.P
please say YES to Samara City Road ... очень хорошо
03_Long_Street_Putin_preview_Picture_of_[...]
JPG-Datei [1.4 MB]

Kontakt

 

0179 40 49 665 DE Tel

 

info@ing-goebel.com

 

Volker Goebel

 

Dipl.-Ing. Arch.

 

 

 

 

 

schöne, aber veraltete Besuchskarte - nur zur Erinnerung

 

-

Druckversion | Sitemap
Volker Goebel / Dipl.-Ing. / Tel 0178 40 49 665 DE / info@ing-goebel.com